Skip to product information
1 of 5

CrafTecker

TaktZeit Tactical Compound Bow Case Soft Bow Case for Hunting 44" Length Bow Bag with Adjustable Shoulder Strap

TaktZeit Tactical Compound Bow Case Soft Bow Case for Hunting 44" Length Bow Bag with Adjustable Shoulder Strap

Regular price $61.95 USD
Regular price $123.99 USD Sale price $61.95 USD
Sale Sold out
Tax included. Shipping calculated at checkout.

Brand: TaktZeit

Color: Reeds

Features:

  • Structure: 1 main pocket, 2 external pockets, 1 single shoulder strap, 2 shoulder straps, 1 woven handle
  • Features: Main pocket for large tools. Two internal adjustable straps to hold tools in place. External pockets for accessories, arrow shafts, slugs, box wax, targets, personal items etc.
  • Material: 600D Nylon outside and 210D Nylon inside. Waterproof fabric, not easy to deform
  • Dimensions:(inch)Large 44"(L)x2"(W)x17"(H)
  • Carrying Method: Carry it by hand,double or single shoulder carry. Braided handle and adjustable straps for labor-saving and protection.
  • Protection: Soft interior foam material and corner guards. Reinforced and sewn at all strength points for durability.
  • Convenience: Double zippers on main pocket, the secondary pockets with single zipper and thread gluing for easy access to items.
  • Use Scene: Suitable for outdoor hunting, shooting, camping and other activities.
  • Suitability: For both men and women.
  • Cleaning Method: Ordinary cleaning cloth wipe, hand wash or machine wash.

Package Dimensions: 14.4 x 11.7 x 5.8 inches

We do not accept returns or cancel for change of mind. We only offer returns for items that are faulty or damaged.

View full details